C&A Stavros Kassidiaris S.A. recently completed a bulk carrier refit project.

The ship exhibited water ingress into 2 out of the 3 levels of the engine room before its repair, rendering it inoperable.

Having many years of experience in the manufacture of Electronic – Electrical and Pneumatic Automation Devices, from research and development to design and manufacture, C&A Stavros Kassidiaris S.A. undertook all the necessary actions for the replacement, addition of new equipment, and the overall completion of the project.

 

For the restoration of proper operation, the following tasks were carried out::

  • Removal of old and installation of a new 200-point Alarm Monitoring System (AMS) (main engine, generators, etc.) with Siemens PLC hardware and display screens (HMI) in the Engine Control Room (ECR) and Wheelhouse (W/H) .
  • Construction and installation of a new panel for the Maneuvering System.
  • Replacement of Fire Alarm System and Water Mist System with Tyco materials
  • Construction of additional various engine room panels

 

The work lasted approximately eight months, and the ship was delivered fully operational.

 

1) Engine Room Console

                     

 

2) Wheelhouse Console

                       

 

3) Various Electrical Panels/Starters